We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Misclassifying a crack is the single most common mistake in this trade — treating a structural crack with the wrong material, or injecting a crack that actually needed a broader drainage fix behind it. We classify before we inject, every time.
Misclassifying a crack is the most common mistake in this trade, and it's the first thing we check on every Burlington, NC job.
An actively leaking crack rarely waits for a convenient afternoon — we prioritize dispatch for Burlington, NC cracks that are currently letting water in.
A single crack repair is one of the most predictably priced jobs we do — no surprise scope creep.
We carry both structural epoxy and flexible polyurethane so the crew can match material to the crack on the same visit.

We scope every Foundation Crack Repair job in person before quoting it, since two properties with the same symptom rarely need the same fix.
Structural cracks that aren't actively leaking get epoxy injection, which bonds the concrete back together rather than just sealing the surface.
Cracks that are still weeping get flexible polyurethane, which expands into voids and stays flexible enough to handle minor seasonal movement.
Stair-step cracking in block foundation walls needs a different injection port pattern than a vertical crack in poured concrete, and we adjust technique accordingly.
Vertical cracks are usually settlement-related and often isolated; horizontal cracks can indicate hydrostatic pressure pushing on the wall and get flagged for further evaluation.
Fast turnaround matters during a real estate transaction, and we prioritize scheduling for time-sensitive pre-sale repairs.

Tell us the crack's location, whether it's actively leaking, and roughly how wide it is so we can bring the right materials.
A technician measures crack width, checks for wall bowing, and determines whether it's structural, cosmetic, or actively leaking.
We explain why we're recommending one material over the other so the choice isn't a black box.
We check the injection ports after curing to confirm the material fully filled the crack before we consider the job done.

"Crack in our basement wall had been leaking for a year before we finally called. Injection took less than an afternoon and it's been dry since."
— Burlington Seller
"Polyurethane injection stopped an active leak the same day they showed up — didn't expect it to be that fast."
— Burlington Homeowner
"Appreciated the before-and-after photos for our records in case we ever need them for a future sale."
— Burlington Customer
"Stair-step crack in our block wall had us worried about the whole foundation. Turned out to be isolated and fixable with injection."
— Burlington Homeowner
Active leaks get flexible polyurethane regardless of classification, since stopping water intrusion is the immediate priority.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
Epoxy is better for structural bonding on a non-leaking crack; polyurethane is better for a crack that's actively weeping since it cures even with water present.
Most single-crack injections are completed in a few hours during one visit.
If new movement occurs elsewhere in the wall, that's a separate issue we'd assess independently.
Yes — we provide before-and-after photos and a repair summary that Burlington, NC buyers, sellers, and lenders commonly request.
We handle foundation crack injection throughout Burlington and the surrounding Burlington, NC service area, including the zip codes listed below.



Zip codes we serve in Burlington, NC: 27217 27215
One call gets you a licensed specialist, a written quote, and a same-day time window.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.